| |
WOODSIDE PHASE V
- Designed, custom built and commissioned pre-insulation plant for Kaefer Integrated Services Pty Ltd. Carried out the pre-insulation of the rundown and loading lines
- Manufactured the shear keys and designed the bolsters to transport the pre-insulated pipes to Karratha.
|
| |
LPG WOODSIDE
- Redesigned,
built and ran pre-insulation line for Bains Harding Industries.
- Designed,
built moulds and manufactured pipe supports and shear keys.
- Manufactured
pipe supports for Woodside Maintenance and Refit
|
| |
WESFARMERS
- Manufactured
and supplied pipe support needs for the Kwinana expansion (debottlenecking)
project.
|
| |
CAPE EAST
(UNITED KINGDOM)
- Manufactured
and supplied pipe supports for BAPE Project in the Philippines.
|
| |
CLOUGH ENGINEERING
- Supplied
pipe coating (co-extruded polyethylene and butyl rubber) for the
UCH Pipeline in Pakistan.
|
| |
CAPE
MODERN JOINT VENTURE
- Profile cutting
of rockwool, polystyrene, polyurethane (low and high density),
foamglass and phenolic foam.
|
| |
BONNY ISLAND
LNG PROJECT
- Redesigned,
built, shipped and erected pre-insulation line as Navarro Chemicals
for Bonny Island LNG facility in Nigeria. Also manufactured the
shear keys and polystyrene bolsters for the project. Sourced all
chemicals and materials for the pre-insulation part of the Bonny
project.
click here to view photos of the project
|